Skip to content
Work in Progress

BIM Integration and Visual Monitoring

Turn your BIM model into a live, color-coded project status board.

The problem

Project status lives in spreadsheets and ERP screens disconnected from the model. Teams scan long numerical lists to work out what's built, what's in production, and what hasn't started, while the BIM model and operational data steadily drift apart.

The solution

BIM Integration and Visual Monitoring keeps BIM data and the ERP system in sync through a bidirectional live connection, then paints production, shipment, and assembly status onto the 3D model with color-coded layers green for completed, yellow for in production, red for not started so anyone can read progress at a glance.

Capabilities

Everything you need, built in

Key features of BIM Integration and Visual Monitoring.

Bidirectional BIM–ERP integration

A live, two-way connection keeps BIM data and the ERP (KKP) system current with each other at all times.

Color-coded status layers

Completed, in-production, and not-started elements appear as green, yellow, and red layers on the 3D model.

Production, shipment & assembly tracking

Follow every stage of the workflow from manufacturing to delivery to on-site assembly directly on the model.

Live digital twin

Maintain a digital twin that continuously mirrors the real-world state of the project.

Model-based process management

Replace complex numerical lists with an explorable, model-driven view of the whole project.

Real-time sync

Status changes flow through automatically as work progresses, so every layer stays accurate.

How it works

From setup to results in four steps

  1. 01

    Connect BIM and ERP

    Establish the two-way live link between the 3D model and the ERP (KKP) system.

  2. 02

    Map elements to status

    Tie each model element to its production, shipment, and assembly state.

  3. 03

    Visualize with colored layers

    Render status as green, yellow, and red layers directly on the 3D model.

  4. 04

    Monitor in real time

    Watch progress update live and run the process straight from the model instead of from lists.

Who it's for

Built for real operations

Construction project tracking

See at a glance what's completed, in production, and not started across the whole structure.

Prefabrication & assembly

Follow elements from production through shipment to on-site assembly on a single model.

Stakeholder reviews

Give teams and leadership a clear visual picture of progress instead of numerical lists.

FAQ

Common questions

It's a bidirectional live connection, so updates in the ERP (KKP) system reflect on the model and changes tracked on the model stay consistent with the system keeping both in sync.

Each element is colored by status: green for completed, yellow for in production, and red for not started.